Menu
EHS Compliance Services
  • Services
  • Clients
  • Blog
  • Contact
EHS Compliance Services
SPCC Plans, Spill Prevention Control & Countermeasures, EHS Consultant in South Florida

Spill Prevention Control & Countermeasures Plan Requirements

Posted on October 26, 2012October 11, 2019

In the last post I briefly reviewed the Spill Prevention Control and Countermeasures  SPCC Plans, Spill Prevention Control & Countermeasures, EHS Consultant in South Florida(SPCC) requirements.  Today’s post will focus on the information that must be included in an SPCC Plan.  The following requirements are summarized from the General Requirements for Spill Prevention, Control, and Countermeasure Plans found in 40 CFR 112.7.

  1. Physical layout of the facility including location of:
    1. Each fixed oil storage containers.
    2. Mobile or portable storage areas.
    3. Exempt underground tanks (marked as “exempt” in the layout).
    4. Transfer stations and connecting pipes (also include exempted lines).
  2. The type of oil and storage capacity for each fixed and mobile container.
  3. Discharge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.).
  4. Discharge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge.
  5. Countermeasures for discharge discovery, response, and cleanup—including onsite capability and those that might be required of a contractor.
  6. Methods of disposal of recovered materials.
  7. Contact list and phone numbers for the facility response coordinator, National Response Center (NRC), cleanup contractors,  and all regulatory agencies who must be contacted in case of a discharge.
  8. Discharge event response procedures—this includes procedures that will provide ease of reporting information pertinent to the spill (i.e. type of material, location information, time and date, etc).
  9. Explanations for the omission of control measures listed in 40 CFR 112.7(c) or 112.7(h).
  10. Inspection and integrity test procedures for the oil containing equipment.
  11. Annual personnel training and discharge prevention briefing requirements and procedures.
  12.  Security procedures for oil containing equipment and processes.
  13. Information on how facility complies with the applicable requirements and other effective discharge prevention and containment procedures or any applicable more stringent State rules, regulations, and guidelines.

Keep in mind this list is extracted form the general federal requirements, additional requirements are found in 40 CFR 112 (i.e. Subpart B and Subpart C) and as always consider the state and local requirements of the facility.

A great starting place for plan creation is the templates provided for Tier I Qualified Facilities.  Even if your facility is Tier II or requires a Professional Engineer (PE) Certification you can reduce costs by drafting the plan and having the PE visit the facility, review and certify the plan.  Need more resources? Check out the EPA’s SPCC Homepage.

Have questions about creating an SPCC Plan?  Leave a comment below or send me an email at info at ehscsi.com.

Recent Posts

  • What is the 5I Methodology?
  • How Attorney-Client Privilege Can Protect Your EHS Audits
  • It’s Time to Build a Workplace That Helps, Not Hurts
  • Elevate Your EHS Training: A High-Level Look at ANSI Z490.1
  • Kahlilah Guyah Featured in EHS Daily Advisor’s Faces of EHS

Archives

  • June 2025
  • May 2025
  • April 2025
  • January 2020
  • October 2019
  • March 2019
  • February 2019
  • December 2018
  • November 2018
  • October 2018
  • June 2018
  • January 2017
  • December 2012
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012

Tag Cloud

audits cal/osha compliance Consulting culture DOT eh&S compliance consultant in South Florida eh&s consultant in south florida EHS ehs compliance ehs consultant ehs management systems ehs professional ehs training emergency releases employee engagement environmental environmental compliance EPA EPCRA hazardous materials hazardous material transportation hazardous waste human capital iso45001 Leadership LEPC OSHA PHMSA psychological health and safety psychosocial factors RCRA safety safety culture SERC small quantity generators SPCC SPCC Plan Spill Prevention Control and Countermeasures stakeholders sustainability Sustainability; EHS compliance training training strategies universal waste

Categories

  • e-manifest
  • EHS Compliance
  • EHS Economics
  • EHS Leadership
  • EHS Management
  • EHS Management Techniques
  • EHS Training
  • Hazardous Material Transportation
  • Hazardous Materials Management
  • Hazardous Waste
  • Human Capital
  • OSHA
  • Psychological Health & Safety
  • Psychosocial Hazards
  • Psychosocial Safety
  • Regulatory Reporting
  • Resources
  • Risk Assessment
  • Safety Culture
  • Trends
©2025 EHS Compliance Services | Powered by SuperbThemes